Power House and Power Plant Dismantlement Services Project Picture

R. Baker & Son All Industrial Services performed the dismantlement and remove of the secondary side of Yankee Atomic's Rowe, MA facility. The project consisted of a 185 MW steam turbine generator and ancillary equipment including a high pressure turbine rotor and blading, an installed low pressure turbine rotor, the generator itself, the rotating and static exciters, the main transformer and the No. 1 station service transformer.  For more information on our dismantling and decommissioning services go to our DISMANTLEMENT SERVICES WEB PAGE

Thursday, April 23, 2009

Project Highlight - Yankee Atomic Nuclear Plant Dismantling Project

R. Baker & Son All Industrial Services performed the dismantling and removal of the secondary side of the Yankee Atomic nuclear power plant in Rowe, MA. This complex 6-month project involved a 185 MW steam turbine generator and its ancillary equipment, including a high-pressure turbine rotor and blading, an installed low-pressure turbine rotor, the generator itself, the rotating and static exciters, and transformers.

Before work could commence, all of R. Baker & Son’s on-site employees had to complete a 40-hour safety training course conducted by the Nuclear Regulatory Commission. Radiation detection badges were required to be worn at all times during the project. Much of the turbine dismantling was executed by utilizing the plant’s existing 100-ton bridge crane. Many of the unit’s components, such as the 115-ton turbine cover and the 178-ton generator stator, exceeded the cranes capacity and required partial dismantlement and engineered lifts. Strict lead abatement procedures were required before all burning and cutting, and all loads were radiation-tested before being transported off-site.

R. Baker & Son takes great pride in our completion of this strictly-regulated and logistically complex project while maintaining our outstanding 5-year incident-free safety record.

Project photos can be seen at YANKEE ATOMIC DISMANTLING PROJECT

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor for dismantlement, decommissioning and demolition in the United States, Canada and Puerto Rico. The veteran owned company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million). Capabilities include total plant and facility dismantlement, decommissioning, demolition, plant relocations and re-installations as well as heavy equipment rigging and machinery moving, millwright services and onsite concrete crushing.

Corporate Contact Information

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or email marketing@rbaker.com

Thursday, April 2, 2009

Power Plant Turbine and Genrator Dismantling Services Nationwide

R. Baker and Son All Industrial Services is an expert rigging, machinery moving and equipment relocation contractor that operates on a nationwide basis. The company has been in operation for over 73 years and is a disabled veteran owned business.

As a heavy rigging contractor, R. Baker & Son is capable of relocating an entire power plant to all types of power plant equipment including:

* Gas Turbine Generators
* Diesel Engine Generators
* Heavy Plant Gearboxes
* Regulators and Synchronizing Equipment
* Boilers
* Blowers and High Pressure Fans
* Auxillary Equipment

Feel free to contact us for an estimate, quotation or bid at marketing@rbaker.com or visit our website at http://www.rbaker.com/

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor for dismantlement, decommissioning, plant relocations and demolition in the United States, Puerto Rico and Canada. The Veteran owned company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) projects that have been awarded VPP OSHA site safety awards) and is financially strong (bonding over $10 Million). Capabilities include total turn-key plant and facility dismantlement, decommissioning, demolition, onsite concrete crushing as well as heavy equipment rigging, entire plant relocations, machinery moving and millwright services.

Contact Information

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: http://www.rbaker.com/
Email: marketing@rbaker.com

Thursday, January 29, 2009

Powerhouse Demolition and Decommissioning Services Nationwide

R. Baker & Son was chosen by PSE&G to perform the decommissioning and dismantling of four(4) gunite lined steel stacks from top of PSE&G's Glenmont Powerhouse. The 20' diameter, 170' tall stacks sat on top of the 165' high building roof for a total height from the ground of 335'.
Tasks involved cleaning and remediation of over 1000 cy of fly ash from the stack bases and breeching. Material management was critical including segregation of fly ash, gunite and carbon steel for recycling.

Rigging and dismantling procedures involved detailed lift plans, weight calculations, monitoring weather conditions and wind loads, confirming ground stability and a number of other critical factors to guarantee that all lifts were safely performed.

One of the largest obstacles was the type of crane to be utilized due to a confined footprint for which to assemble equipment and which was surrounded by live power lines, cooling towers and new powerhouse which remained on line 24/7.

R. Baker & Son working together with PSE&G engineering and Lomma Crane decided to utilize a M760 ton Favco tower crane erected on top of the powerhouse to be utilized for the lifting and lowering to ground of stack sections. R. Baker & Son erected and installed a base for the Favco tower crane and tied it directly into the building's column lines. A 500 ton hydraulic Demag was utilized to hoist workers in a certified man basket over 350' in the air in order to perform rigging and dismantling activities.

For more information on our demolition services, feel free to visit http://www.rbaker.com/plant-decommissioning-contractors.php

Please contact us for an estimate, proposal or bid.

Contact Information

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

Email: marketing@rbaker.com