R. Baker and Son All Industrial Services’ Efforts Contribute to Facility of the Year AwardR. Baker & Son All Industrial Services, an expert dismantlement, demolition, rigging and re-installation conytractors, contributed to a global pharmaceutical company winning the Facility of the Year Award 2008 in the category of Equipment Innovation.
The Facility of the Year Awards program, sponsored by ISPE, INERPHEX, and Pharmaceutical Processing Magazine, recognizes state-of-the-art pharmaceutical manufacturing projects that utilize new and innovative technologies to enhance the delivery of a quality project, as well as reduce the cost of producing high-quality medicines.
The expansion project began by the Fortune 500 pharmaceutical company awarding R. Baker and Son All Industrial Services (R. Baker & Son) the interior demolition and equipment salvage contractor work. The goal of this phase of the project was to perform a total interior gut out while leaving the structural members in place. This required an immense amount of preparation, coordination and attention to safety. After making sure all environmental concerns were addressed properly and that utilities had been disconnected or relocated, equipment salvage was commenced. R. Baker & Son was able to help the client offset some of the costs of the project through their expertise in process equipment sales and salvage. Once the salvaged equipment was removed and sold, the remaining interior demolition was conducted. This included demolition of all CMU walls, removal of elevator and stairwells, removal of sheet rock walls and drop ceiling and all remaining interior non load bearing structures. In addition, a significant portion of the first floor slab was removed along with all equipment pads on the penthouse floor.
After interior demolition services were completed, R. Baker & Son repaired all floor openings as per specifications which included new rebar and concrete. The client then performed the necessary pre- construction tasks in preparation to receive the new equipment for the expansion project.
R. Baker & Son was then called back in to perform the next phase of work which was the reinstallation of the new equipment. R Baker & Son was intricately involved with the detail development of the scope of work with vendor equipment shop drawings (many in German). The scope of work was to receive, rig, set and assemble/install all of the process equipment for the project. This included the new Lyopholizer, Automated fill line, process chiller, formulation isolation equipment, process air handlers, Fluid beds MP3 and MP4. Control cabinets, HMIs, various isolation chambers and complete assembly of all shipped parts from the factory acceptance tests. The shipped parts were stored in a clean area and boxes of parts numbered in the hundreds. Laser precision was needed to set equipment due to tight tolerances. R. Baker and Son performed any necessary shimming, pressure testing, mounting, leveling, and daily protection of the new epoxy floors which could not be damaged.
R. Baker & Son was also tasked with assisting with commissioning and startup of the newly installed equipment. The startup process was completed with ease due to all the upfront technical planning and the expert installation performed by the R. Baker & Son re-installation crews.
Despite the complexity of rigging and re-installing this delicate and very expensive process equipment, R. Baker & Son was able to safely and efficiently complete the project without damage to any of the equipment. The project was also on-schedule and within budget.
R. Baker & Son also participated in the project’s Star Program of OSHA’s Voluntary Protection Program (VPP). As always, safety was of highest priority, and the job was completed without incident.
For more information on the project visit
http://www.facilityoftheyear.org/categorywinners2008.cfmAbout R. Baker & Son All Industrial ServicesR. Baker & Son All Industrial Services is the premier specialized contractor for dismantlement, decommissioning, plant relocations and demolition in the United States, Canada and Puerto Rico. The Veteran owned company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been actively involved in four (4) projects that were awarded VPP OSHA site safety awards) and is financially strong (bonding over $10 Million). Capabilities include total plant and facility dismantlement, decommissioning, demolition, onsite concrete crushing as well as heavy equipment rigging, entire plant relocations, machinery moving and millwright services.
Contact InformationR. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website:
http://www.rbaker.com Contact: Damon Kozul, PE, CHMM
dkozul@rbaker.com