Thursday, April 2, 2009

Power Plant Turbine and Genrator Dismantling Services Nationwide

R. Baker and Son All Industrial Services is an expert rigging, machinery moving and equipment relocation contractor that operates on a nationwide basis. The company has been in operation for over 73 years and is a disabled veteran owned business.

As a heavy rigging contractor, R. Baker & Son is capable of relocating an entire power plant to all types of power plant equipment including:

* Gas Turbine Generators
* Diesel Engine Generators
* Heavy Plant Gearboxes
* Regulators and Synchronizing Equipment
* Boilers
* Blowers and High Pressure Fans
* Auxillary Equipment

Feel free to contact us for an estimate, quotation or bid at marketing@rbaker.com or visit our website at http://www.rbaker.com/

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor for dismantlement, decommissioning, plant relocations and demolition in the United States, Puerto Rico and Canada. The Veteran owned company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) projects that have been awarded VPP OSHA site safety awards) and is financially strong (bonding over $10 Million). Capabilities include total turn-key plant and facility dismantlement, decommissioning, demolition, onsite concrete crushing as well as heavy equipment rigging, entire plant relocations, machinery moving and millwright services.

Contact Information

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: http://www.rbaker.com/
Email: marketing@rbaker.com

Thursday, January 29, 2009

Powerhouse Demolition and Decommissioning Services Nationwide

R. Baker & Son was chosen by PSE&G to perform the decommissioning and dismantling of four(4) gunite lined steel stacks from top of PSE&G's Glenmont Powerhouse. The 20' diameter, 170' tall stacks sat on top of the 165' high building roof for a total height from the ground of 335'.
Tasks involved cleaning and remediation of over 1000 cy of fly ash from the stack bases and breeching. Material management was critical including segregation of fly ash, gunite and carbon steel for recycling.

Rigging and dismantling procedures involved detailed lift plans, weight calculations, monitoring weather conditions and wind loads, confirming ground stability and a number of other critical factors to guarantee that all lifts were safely performed.

One of the largest obstacles was the type of crane to be utilized due to a confined footprint for which to assemble equipment and which was surrounded by live power lines, cooling towers and new powerhouse which remained on line 24/7.

R. Baker & Son working together with PSE&G engineering and Lomma Crane decided to utilize a M760 ton Favco tower crane erected on top of the powerhouse to be utilized for the lifting and lowering to ground of stack sections. R. Baker & Son erected and installed a base for the Favco tower crane and tied it directly into the building's column lines. A 500 ton hydraulic Demag was utilized to hoist workers in a certified man basket over 350' in the air in order to perform rigging and dismantling activities.

For more information on our demolition services, feel free to visit http://www.rbaker.com/plant-decommissioning-contractors.php

Please contact us for an estimate, proposal or bid.